![]() The connectivity also makes the space a testing center for digital assessments like the PARCC exam. ![]() The aesthetics were modernized, acoustics were improved, and the HVAC system was replaced.ĭesigned for today’s learners, students in this 1-1 school now have Wi-Fi access points throughout. The original orchestra pit built in the 1920s was exposed and is back in use. As a result, the Auditorium is now a multi-purpose space where classes, after school activities, and community events are held. The performing arts design solution created agile spaces that are collaborative in nature, while still meeting the goals of the curriculum. Performing Arts Design brings 19th century structure into the 21st century As a result, the new performing arts design was comprehensive. In the dated, heavily-used Reber Center for the Performing Arts, the HVAC system was loud and caused vibration. ![]() The existing North Building, portions of which date back to 1899, was cramped and dark. Reber Center for the Performing Arts Renovation at Lyons Township High School North Campus ![]()
0 Comments
Leave a Reply. |
Details
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |